Cedar Park EliteConcrete & Masonry
Commercial concrete paving crew finishing a large slab
Commercial concrete

Commercial Concrete Flatwork Contractors in Cedar Park

Dumpster pads, ADA ramps, sidewalks, curb and lot repairs for retail, office and multifamily properties, phased so the business stays open.

Request a Bid
Retail centersOffice parksApartmentsChurches & schools

Concrete Commercial Contractors: Flatwork We Bid

WorkNotes
Dumpster pads and apronsThick, heavily reinforced, sized for truck wheel loads
ADA ramps and routesBuilt to slope and landing limits, checked with a digital level
Sidewalk and curb repairPanel replacement, trip-hazard removal
Parking lot sectionsPanel replacement and small new lots

Phasing Work Around Open Businesses

  1. Walk the site with the manager. Map entrances, deliveries and fire lanes.
  2. Plan the phases. Close one section at a time, with signage.
  3. Handle the right-of-way. Work in the public right-of-way gets the city permit first. Site-development driveways follow the Type II commercial criteria in Cedar Park's code (site development checklist).
  4. Pour off-hours when traffic allows, and reopen once the concrete reaches strength.

Commercial Concrete Companies Near Me: What Owners Should Compare

On commercial bids the scope sheet matters more than the total. Look for the slab thickness and psi at truck routes, how ADA slopes will be verified, who carries the traffic control, and whether the bid includes saw-cutting, haul-off and joint sealant. Two bids that don't list the same items aren't comparable.

For residential walks and private paths, see sidewalks.

Concrete curb ramp with a detectable-warning pad at a street corner
Stock photo, shown as a style example (credits on the privacy page)

Commercial Concrete Questions

Do you pave full parking lots?

We do concrete flatwork for small commercial sites: dumpster pads, ADA ramps, sidewalks, curb and gutter repair, and panel replacement in lots. For a large new lot, we'll say plainly if the job is bigger than our crew.

Can you work nights or weekends?

For phases that would block an entrance, yes, when the city's noise rules and the ready-mix plant's hours allow it. We plan that during the site walk.

What paperwork should a property manager ask for?

From every bidder: a current certificate of insurance naming the owner and manager as additional insured, a scope sheet with thickness, psi and joint layout, and a phasing plan. Ask before the contract, not on mobilization day.

Request a Commercial Bid

Rather talk? Call (737) 888-5720. Every request gets a reply, including a plain no if it isn't our kind of work.

CallFree Estimate